Products · Boilers & Heat Recovery

Process Gas Boilers

To establish the project design basis for “Process Gas Boilers”, confirm “Process-gas and heat-recovery duty” and its inputs: Specify gas composition and flow, inlet/outlet temperatures, contaminants/fouling, allowable pressure drop and steam-generation conditions. Final values, supply limits and acceptance criteria are recorded in approved engineering documents; no generic capacity or catalogue guarantee is assumed.

Process Gas Boilers

From project definition to delivery

Engineering intent and design approach

Engineering of Process Gas Boilers concentrates on steam pressure and temperature, circulation, furnace or process-gas duty, feed-water quality, blowdown, pressure-part design, emissions, control range and operating flexibility. The selected configuration is verified against normal, minimum, start-up, shutdown and credible upset cases, then checked for operability, maintainability, energy use, process safety and site interfaces before the design is frozen.

The design basis for Process Gas Boilers is defined from service data, design conditions, and battery limits. For this equipment, Process-gas and heat-recovery duty and Feed and thermal conditions must be completed in the datasheet and design documents; performance values and guarantees are set only after the project basis is approved.

Mechanical design and materials

Materials, corrosion allowance, sour-service requirements, piping classes, nozzle design, insulation, coating, supports and maintenance access are coordinated with the actual process conditions and project code hierarchy.

Control, safeguarding and operation

Control philosophy, alarms and trips, cause-and-effect logic, interlocks, start-up and shutdown sequences, safe depressurization and operator access are developed consistently from the P&IDs through functional testing.

Layout, utilities and interfaces

Battery limits, tie-in points, structural loads, cabling, instrumentation, drains, vents, access routes, lifting envelopes and shipping constraints are controlled through coordinated models and interface drawings.

From project definition to delivery

Clear inputs and contract-ready outputs

Proposal quality depends on complete input data and an explicit acceptance basis. The following lists provide a practical starting point and are completed during technical clarification.

Recommended RFQ information

  • “Feed and thermal conditions”: Record feedwater/process-gas quality/flow, fuel, hot-gas conditions, inlet/outlet temperature and fouling/corrosion.
  • “Heat-transfer and pressure parts”: Specify circulation, heat-transfer surface, coils/tubes, drum if needed, economizer/superheater and cleaning strategy.
  • Site and ambient data, hazardous-area classification and HSE requirements
  • Available utilities with pressure, temperature and capacity
  • Applicable standards, materials, supply limits and owner document formats

Typical engineering and supply deliverables

  • Equipment datasheet and design basis for “Process Gas Boilers”, with service-relevant calculations where included in the supply scope.
  • PFDs, P&IDs, equipment list and technical datasheets
  • Control philosophy, cause and effect, I/O definition and utility summary
  • Plot plan, 3D model, foundation loads and fabrication drawings
  • Inspection and test plans, FAT records, final data book and commissioning support

Technical Datasheet

Technical Datasheet — Process Gas Boilers

The numeric values below describe one refinery FCCU CO-boiler permit case. They are project-specific, not a generic steam-boiler range or a Delham guarantee.

Published equipment-family or project data only; not a universal standard limit or Delham rating/guarantee.
ParameterPublished valueReference basisApplicability / limit
Steam-production capacityAbout 125,000 kg/h (125 t/h)Facility permit description for one CO boiler firing refinery fuel gas and/or FCCU catalyst-regeneration process gas.One facility/project rating; feed composition, CO load, auxiliary firing and steam conditions are site-specific.
Maximum thermal input400 GJ/hMaximum heat input stated in the same facility authorization.Regulatory permit limit for that unit, not boiler output duty; do not derive a general efficiency from the paired figures.
Process-gas serviceFCCU catalyst-regeneration gas + refinery fuel gasPublished fuel description for the permitted refinery CO boiler.CO oxidation, catalyst fines, sulfur/nitrogen species, auxiliary fuel and downstream controls require case-specific design.

Published technical source

Delham Engineering

Define the scope around real project data

Send the available process data, battery limits and expected document list for a technical proposal. The engineering team will identify missing information through a structured clarification register.

Submit technical enquiry