Packages · Process Packages

Gas Sweetening Packages

To establish the project design basis for “Gas Sweetening Packages”, confirm “Acid-gas load and treated-gas basis” and its inputs: Provide feed flow and composition, H2S/CO2 loading, pressure/temperature, solvent basis and treated-gas specification. Final values, supply limits and acceptance criteria are recorded in approved engineering documents; no generic capacity or catalogue guarantee is assumed.

Gas Sweetening Packages

From project definition to delivery

Engineering intent and design approach

Engineering of Gas Sweetening Packages concentrates on acid-gas removal targets, solvent selection and loading, absorber hydraulics, circulation rate, regeneration duty, solvent degradation, corrosion and sour-service safety. The selected configuration is verified against normal, minimum, start-up, shutdown and credible upset cases, then checked for operability, maintainability, energy use, process safety and site interfaces before the design is frozen.

The design basis for Gas Sweetening Packages is defined from service data, design conditions, and battery limits. For this equipment, Acid-gas load and treated-gas basis and Feed and outlet specification must be completed in the datasheet and design documents; performance values and guarantees are set only after the project basis is approved.

Mechanical design and materials

Materials, corrosion allowance, sour-service requirements, piping classes, nozzle design, insulation, coating, supports and maintenance access are coordinated with the actual process conditions and project code hierarchy.

Control, safeguarding and operation

Control philosophy, alarms and trips, cause-and-effect logic, interlocks, start-up and shutdown sequences, safe depressurization and operator access are developed consistently from the P&IDs through functional testing.

Layout, utilities and interfaces

Battery limits, tie-in points, structural loads, cabling, instrumentation, drains, vents, access routes, lifting envelopes and shipping constraints are controlled through coordinated models and interface drawings.

From project definition to delivery

Clear inputs and contract-ready outputs

Proposal quality depends on complete input data and an explicit acceptance basis. The following lists provide a practical starting point and are completed during technical clarification.

Recommended RFQ information

  • “Feed and outlet specification”: Record feed phase/composition, relevant contaminants, water/solids/salts/hydrocarbons, product/effluent targets and pressure-drop limit.
  • “Technology and process arrangement”: Select separation/treatment method, stages/internals, chemicals/adsorbent, filtration and standby options from feed analysis.
  • Site and ambient data, hazardous-area classification and HSE requirements
  • Available utilities with pressure, temperature and capacity
  • Applicable standards, materials, supply limits and owner document formats

Typical engineering and supply deliverables

  • Equipment datasheet and design basis for “Gas Sweetening Packages”, with service-relevant calculations where included in the supply scope.
  • PFDs, P&IDs, equipment list and technical datasheets
  • Control philosophy, cause and effect, I/O definition and utility summary
  • Plot plan, 3D model, foundation loads and fabrication drawings
  • Inspection and test plans, FAT records, final data book and commissioning support

Technical Datasheet

Technical Datasheet — Gas Sweetening Packages

A public manufacturer datasheet publishes the modular sizes below. These are reference values for amine-solvent circulation and package equipment only—not an industry-wide code limit, gas-feed capacity, or Delham rating.

Published equipment-family or project data only; not a universal standard limit or Delham rating/guarantee.
ParameterPublished reference valueSI / secondary unitsApplication limit
Five-size modular amine-circulation series10, 20, 40, 80 and 120 US gal/min2.27–27.25 m³/hFive published package sizes; this is solvent flow, not gas-feed flow.
Custom amine circulation125–2,000+ US gal/min28.39–454.25 m³/hPublished custom-design envelope; not a standardized series or guaranteed range.
Reboiler duty in the five-size series0.75–5.5 MMBtu/h220–1,612 kWReference-series duty; confirm heat source and project operating cases.
Contactor tower in the five-size seriesOD: 18–30 inOD: 457–762 mm; L: 52.5 ft (16.00 m); 20 traysOne published equipment family; not a universal tower-sizing rule.
Gas throughput and treated-gas limitsProject-specificNot inferred from solvent circulationSet from feed rate/composition, H2S/CO2 partial pressures, product specification and operating cases; agree acceptance criteria contractually.

Published technical source

Applicable pressure and temperature limits are established from the project design basis. The cited market reference does not publish a universal treated-gas flow rate; do not convert its US gal/min solvent figures to MMSCFD.